Water Infrastructure
Project
Client
Country Project Period
Services
The water supply system has been designed for the project area “Tourism Complex Shahgag” to provide reliable drinking, waste, storm and fire fighting water, heating & cooling system. Total distribution line length of the designed potable water system is 13,800 m. where its 4,900 m. long line has been designed to pump up to 650 m high. The sewer system has been designed to collect the waste water produced in the project area and discharge it into the sewer system. The waste water system consists of 12,350 m. length pipe construction and 234 manholes. 3750 m. of the waste water system has been designed for 650 m. height difference. Energy compensating shafts have been designed for the inclined terrains (for 3750 m. of the system) in order to reduce the high energy and velocity affects to the manholes.The storm water disposal system has been designed to collect the storm-water run-off from the roofs and from the sealed surfaces in the project area “Tourism Complex Shahgag” and has been discharged into the nearby effluent receiving water body. The storm water system consists of 7,900 m. length pipe construction and 193 manholes.
Shahdag Winter & Summer Tourism Complex Infrastructural Engineering
Azerbaijan Republic Ministry of Culture and Tourism / DIA Holding
Gusar / Azerbaijan 2010-2012
• Detail Design & Master Planning • Infrastructure Engineering