Page 62 - Bir Engineering INC.
P. 62

Dams
Project  Baysh Dam
Kingdom of Saudi Arabia Ministry of Water & Electricity /
Client
Country Project Period Services
The scope of the project is to build concrete gravity Dam. Baysh Dam is located in Baysh Valley, which has a road distance of 113 km. to the City of Jizan, Saudi Arabia. The purpose of the dam is flood control and supply of water to downstream farmlands for irrigation. Total storage capacity is 192 million m3. Uncontrolled overflow ogee type spillway of 8,200 m3/sn, capacity and 4 units of bottom outlets take place on the main dam body. Catchment area: 4600 km2, Mean Annual Flow: 74.48 MCM, Maximum Storage Volume: 192.75 MCM, Wadi Bed Elevation: 265 m.a.s.l., Foundation Elevation: 233 m.a.s.l., Dam Type: Concrete Gravity,Volume of Concrete: 670 000 m3, Dam Crest Length: 340 m., Height Above Foundation: 106 m., Spillway Crest Length: 112.0m., Number of Bottom Outlets: 4.
Yüksel Construction Co.
Jizan / Saudi Arabia 2003-2009
• Detail Design


































































































   60   61   62   63   64