Page 39 - Bir Engineering INC.
P. 39
Tunnels
Project Client
Country Project Period
Services
Istanbul Ikitelli-Olimpic Village cut & cover tunnels about 2000 meter length 20-30 meter buried have been designed. Tunnels are box type and width and height varies according to track line and soil profile. As soil profile changes from top to down, the excavation and bracing type varies. Fill layer design and excavated with slopped open trench. Limestone or stiff layer braced with soil nailing and anchored piles. There are eight structurally different types of tunnels including double floored type. Tunnels divided into 36 meter lenght blocks with expansion joints to avoid thermal expansion forces.
Istanbul Ikitelli Olimpic Village Metro Line Cut & Cover Tunnel
Istanbul Metropolitan Municipality/ Gülermak-Doğuş JV
Istanbul / Turkey 2006-2012
• Detail Design and Shop-drawings • Geotechnical Engineering

