Page 35 - Bir Engineering INC.
P. 35

Roads & Bridge
Project
Client
Country Project Period
Services
Olimpic Viaduct is 450 meters long, 10 meters wide with prestressed precast concrete beams and cast in place slab composite superstructure on hollow box concrete pier max 38 meters high founded on shallow and bored pile foundations.
Istanbul Ikitelli- Olimpic Village Metro Line, Olimpic Viaduct
Istanbul Metropolitan Municipality / Gülermak-Doğus JV
Istanbul / Turkey 2006-2012
• Detail Design and Shop-drawings • Geotechnical Engineering


































































































   33   34   35   36   37