Page 33 - Bir Engineering INC.
P. 33

Roads & Bridge
Project
Client
Country Project Period
Services
The project of 24 km. road to be realized in the eastern part of Dubai starts from the border of Sharja, which is the neighboring Emirate in the north, and ends by intersecting with Dubai- Al- Ain Road in the south. Contract covers upgrading the existing two lane highway to four lanes in both directions and arranging the infrastructure to allow increasing to six lanes in the future and expanding the existing four underpasses and construction of a new underpass and relocation of existing street lighting, services and other superstructures. Al-Awir interchange bridge is rebuilt, having 52+52m. two spans with a total length of 104m. with 42° skew angle. The section is post tensioned double trapezoidal with a height of 2.5m.
R 762/1 I & II Section Dubai Bypass Road Expansion Work, Al-Awir Interchange Bridge
Dubai Road & Transport Authority/ Yüksel Construction
Dubai / UAE 2007-2009
• Detail Design and Shop-drawings • Consultancy


































































































   31   32   33   34   35