770 MWa Power plant with two gas and one steam turbines. Plant includes Machine Hall, Electrical Annex Building, Demineralisation Building, Cooling Tower, Cooling Tower Pump House, Heat Recovery Steam Generator, Fire Fighting Pump House, Piperacks and Cable Trenches. Construction period is 26 months (95% in the first 12 months).
Ankara Natural Gas Combined Cycle Power Plant
Baymina Energy/
Va-Tech & Yüksel Construction Co. Consortium.
Ankara / Turkey 2001-2003
• Detail Design Review
• Value Engineering
• Project Management of Design